Used Boats: 32 Adverts Displaying: 31-32
Construction
CONSTRUCTION
Welded plate steel hull
Steel formed internal structural members, welded to hull plating 6mm plate to form keel and hull bottom plates 5mm plate to form second plate 4mm plate to form third plate.
Underwater hull plates coated with International Paints primer and antifouling.
Topsides finished in International Paints Toplac snow white gloss paint
Deck & Superstructure Construction:
Welded plate steel deck, coachroof superstructure and self-draining cockpit 4mm plate steel to form decks and 3mm superstructure.
Decks finished with Internati...
read more
| Year: | 1992 |
| Length: | 10.300m |
| Location: | North Ayrshire UK |
| Price: | £25,000 Tax Paid |
View Details |
Construction
Both hull and deck mouldings are laid up in accordance with Northshore's Nordseal system.
The hull topsides has a 1/2 inch balsa core sandwich and is double gel-coated in blue. The cored topsides provide both panel stiffness and thermal insulation.
The sandwich construction is stopped 6 inch's short for the waterline.
Below this to the hull centerline is solid single laminate with a clear gel-coat which Copper coat is applied in 2015.
The Hull is supported by GRP base mouldings incorporates transverse floors, longitudinals, and the bulkheads are glassed in to the...
read more
| Year: | 1998 |
| Length: | 11.580m |
| Location: | North Ayrshire UK |
| Price: | £115,000 Tax Paid |
View Details |